What a fractional COO does in the first 90 days.

Jennifer Bailey, MSReviewed November 20264-minute read

A fractional COO’s first 90 days run in order: learn how the business really runs, set an operating rhythm that works without them, fix the one problem that costs most, and write it all down. On day 90 you should hold a map, a short list of numbers, a rhythm that has run twice without you, and a clear next step.

A fractional COO’s first quarter has a shape, and an owner who knows it can tell within a few weeks whether the work is on track. This is the shape we work to, and what you should be holding on day 90.

Before day one: the scope, in writing

A short discovery comes first. It settles what has to change and by when, how many hours the role gets, and the measures it will be judged by. You see all of that in writing before anything begins. If the scope can’t be written down in a page, the engagement isn’t ready to start.

Days 1 to 30: listen, then map

The first month is mostly listening, and the owner is the least useful person to start with. The people who do the work know where an order waits, which spreadsheet holds the real number, and what happens when someone is out.

  • Short interviews with the people who do the work, not only the leaders.
  • A map of how the business runs today, drawn from what people actually do, including the parts that make no sense.
  • A weekly look at the few numbers that describe the business, started in week one, even if they’re rough. A number you’ve watched for ten weeks tells you more than a good one you saw once.
  • One operating review with the owner a month, with the month’s priorities written down.

Nothing gets redesigned yet. A COO who starts changing things in week two is working from opinion, and the staff will know it.

Days 31 to 60: set the rhythm, fix one thing

By the second month there is enough evidence to act on, and two things happen together.

The rhythm starts to run without the COO in the room. Weekly numbers, a monthly review, priorities set for the quarter. Department leads begin bringing their own items to it, and the owner stops being the place every decision queues.

One problem gets fixed properly. Choose the one that costs most, usually a handoff nobody owns or a step that exists only because it always has. Pilot the change with one team, or run it beside the old way, before it replaces anything. Fixing five things at once is how none of them stick.

Days 61 to 90: write it down and hand it on

The last month is for making the work survive the person who did it.

  • Written procedures for the changes that worked, in the words of the people who use them.
  • Roles and handoffs with a named owner for each.
  • A job description for the permanent role, drawn from what the work actually turned out to be, not from a template.
  • A recommendation on what comes next: continue month to month, hire, or stop.

That last item is a real choice. Some businesses finish the first term with a system that runs and no need for more hours. Saying so is part of the job.

What you should be holding on day 90

  1. A map of how the business runs, which you can read and correct.
  2. A short list of numbers, reviewed on a schedule, with a named person for each.
  3. An operating rhythm that has run at least twice without the owner chairing it.
  4. One change that was tested, adopted and written down.
  5. A clear next step, with its reasoning.

What it shouldn’t look like

  • A binder at day 90 and nothing running. A report is not an operating system.
  • A COO who only talks to you. If the staff haven’t met them by week three, the map is a guess.
  • Changes in the first fortnight. Early action feels like momentum and is usually noise.
  • No measures. If nobody can say what better looks like, nobody can say it happened.

Questions to ask before you sign

  1. What will we both be able to point to on day 90?
  2. Who will you talk to besides me?
  3. How will you test a change before it goes live?
  4. What happens if we decide we don’t need you after the first term?

Our own answer to the last one is in the engagement: a 90-day first term, then month to month, and help hiring the permanent COO is included. The shape of a month and the retainers are on the fractional COO page.

Our engagement terms are on the fractional COO page.